Flash Floods Archives — LIRNEasia


What we recommended after the 2015 earthquake, and what 26 August 2026 showed  Bottom Line  Only 3 of 120 Nepal Telecom sites were flooded. On the worst day, 83 were down. The network failed on power and access, not water. Assessing that risk was Goal I of our 2016 report.  Day two, 40% restored, same pattern from the 2015 earthquake and the 2026 flood.