All these years Sri Lanka was connected to its main international communication conduits (SEA-ME-WE 2, 3 and 4) from Colombo and Mount Lavinia (a suburb of Colombo) over branch cables. In the case of SEA-ME-WE 5, the new consortium cable that is expected to come online in 2016, the connection will be direct, in that the Alcatel built cable will terminate in Brown’s Hill in Matara (close to the southernmost point of Sri Lanka) and the eastern component to be built by NEC will commence from the same location. This will shave off several milliseconds from the delivered latency partly because of the use of superior regenerators and partly because of the reduced distance. This is what Wikipedia says: Latency is largely a function of the speed of light, which is 299,792,458 meters/second in vacuum. This would equate to a latency of 3.